PROJECT CASE

Congolese Government Building & Kinshasa Financial Center

Democratic Republic of the Congo

2023

Style: Modern Luxury & Government Public

Area: 20,000+ m²

Location: Kinshasa

Congolese Government Building & Kinshasa Financial Center

Project Overview

Located in the heart of Kinshasa, between the Ministry of Foreign Affairs and Athénée de la Gombe, this landmark project consists of two twin towers (20 and 16 stories). It houses the Ministry of Finance, the Ministry of Budget, a 3,000-seat auditorium, and a luxury 5-star hotel. As a symbol of national development, the project demanded the highest standards of interior decoration.

Congolese Government Building & Kinshasa Financial Center

The client spent 5 months touring multiple provinces in China to find a supplier that met rigorous international safety certifications (Fireproof Class B) suitable for presidential and ministerial offices. * Visual Consistency: With over 20,000 square meters of decoration, maintaining 100% color consistency across walls, doors, and cabinetry was critical. * Tight Timeline: The project had a strict deadline for the December 2023 inauguration, requiring a supplier with massive production capacity and fast delivery

Congolese Government Building & Kinshasa Financial Center

Gooday/Melinco provided a comprehensive “One-Stop Interior Solution” that perfectly balanced aesthetics and performance:

  • 1:1 Same Color System: We utilized our exclusive technology to ensure the WPC Wall Panels, Integrated Doors, and Cabinetry shared the exact same texture and color tone, creating a seamless, high-end look.

  • Product Selection: We selected the 176 Fluted Decor Panel and 180 Convex Decor Panel combined with Hollow 600 Panels. These materials are eco-friendly (ENF Grade), waterproof, and durable enough for high-traffic government buildings.

  • Customization: We provided customized decorative lines and invisible door systems to match the modern architectural style.

Congolese Government Building & Kinshasa Financial Center

The project was successfully completed and inaugurated in December 2023. Melinco’s materials passed all rigorous on-site inspections. The “Zero Aldehyde” eco-friendly standard provided a safe working environment for government officials. This project stands as a testament to Melinco’s ability to handle large-scale international engineering projects.

Congolese Government Building & Kinshasa Financial Center

what makes us different

Why Melinco Was Chosen for This Landmark

1:1 Same Color System

Achieved 100% visual unity across WPC wall panels, integrated doors, and cabinetry using our exclusive PUR hot-melt wrapping technology.

Rapid Production & Delivery

Backed by our 50,000 m² factory, we delivered 20,000+ m² of materials strictly on schedule for the 2023 inauguration.

Certified Government Standards

Met rigorous international safety requirements: Fireproof Class B and ENF-Grade "Zero Aldehyde" for a safe presidential office environment.

One-Stop Engineering Solution

Provided end-to-end service from 3D deepening design and material selection to global logistics and installation guidance.

Catalog
floating-bar-download
Contact
floating-bar-contact
floating-bar-share
Back to top
floating-bar-btt